Free Electrical Diagnostic Β· 9 Vectors Β· Under 3 Minutes
Find Out Exactly How Much Your Shop Is Leaking
A 3-stage diagnostic checking 9 profit-bleed vectors across field labor, execution, and billing. Real numbers from your real operation.
π Real-time calculationβ‘ Results in 3 minutesπ Nothing stored
Stage 1 of 3
Questions 1β3 of 9
β Field & Labor
β‘ Field Execution
β’ Billing & Contracts
Stage 01 / The Hook
Field & Labor Dynamics
Establishes your baseline β every downstream calculation anchors to these inputs.
Q1 Β· Company Profile
Revenue, crew count & loaded hourly rate
Every formula below anchors to these three numbers. Use your fully-loaded rate including burden, insurance, and benefits.
Q2 Β· Annual Technician Turnover
Field electricians replaced per year
$0
turnover leak/yr
Industry average is 20β30% for electrical field staff. Every departure triggers replacement cost plus ramp drag on the new hire.
3 replaced/yr
0715
Q3 Β· New-Hire Ramp Time
Weeks to reach full billable productivity
$0
ramp deficit/yr
During ramp, new electricians typically bill at ~60% efficiency while drawing full wages. The gap is pure overhead.
6 weeks
2 wks9 wks16 wks
Stage 02 / The Exposure
Field Execution
This is where unbilled labor surfaces. Most owners assume their job-costing catches this β it doesn't.
Q4 Β· Unbilled Field Labor
Ghost Labor β extra time on-site not captured
$0
ghost labor leak/yr
If your job-costing isn't mapping actual field hours back to client invoices, 15β20% of change-order-adjacent labor is likely never billed. That's Ghost Labor.
8 hrs/wk
0 hrs20 hrs40 hrs
Unbilled field labor (loaded rate)$0 / yr
Q5 Β· Monthly Callback / Rework Rate
Return trips and corrective work
$0
callback cost/yr
Each callback costs approximately $180 in return-trip labor, material re-use, and schedule disruption.
4 callbacks/mo
01530
Q6 Β· Warranty & Punch-List Billing
How is warranty/close-out work billed to clients?
If punch-list and warranty work isn't billed separately, you're absorbing $60β$120 per visit in labor cost.
We don't perform warranty visits
No leak in this category
Billed per visit or via retainer
Minimal leak if rate covers cost
Not billed β absorbed as overhead
Guaranteed margin leak at volume
Warranty billing gap$0 / yr
Stage 03 / The Closing Proof
Billing & Contract Drift
This is where standard job-costing tools go silent. These leaks compound invisibly for months β sometimes years.
Q7 Β· Change-Order Capture Audit
Last review of field change-orders vs. signed approvals
Crews routinely perform scope changes in the field before paperwork catches up. Every unsigned, unbilled change order is direct revenue leakage.
Within the last 3 months
Active tracking β minimal capture gap
3β12 months ago
Change orders likely slipping through
Over 12 months ago or never
Significant unbilled change-order work almost certain
Estimated change-order capture leak$0 / yr
Q8 Β· Material Markup Pass-Through
2026 copper & wire price volatility
Copper and wire pricing has moved sharply through 2026 β well into double digits year over year. If your pricing doesn't adjust between quote and install, you absorb the difference.
Yes β pricing auto-adjusts
Material escalation clause or real-time repricing in place
No β we quote at a fixed rate
High risk of absorbing 2026 price swings
Not sure
This is where we typically find $6,000β$18,000 in hidden material absorption
Q9 Β· Job-Costing β Payroll Integration
Automated sync or manual reconciliation?
Manual bridging between field time-cards and job-costing averages 4-6 hours per week of admin waste β plus elevated billing error risk.
Fully automated
Time-tracking syncs directly to job costing β minimal admin waste
Partially automated
Some manual steps required β ~3 hrs/wk reconciliation waste
Fully manual
Spreadsheets or separate entry β ~6 hrs/wk waste plus high error risk
Almost there β unlock your full breakdown
Enter your email to see your category-by-category leak analysis and total estimated annual waste.
Please enter a valid email address.
No spam. Unsubscribe anytime. We never sell your info.
Your Estimated Annual Margin Leak
$0
across labor, billing, throughput, and contract drift
β οΈ Ghost Labor Risk Detected
Leak Category Breakdown
π‘οΈ The $75,000 Identification Guarantee
We identify at least $75,000 in recoverable annual waste β working entirely within your existing tools. No software changes. No system replacement. No disruption to your operation. Just a 7-business-day remote audit and a clear PDF report with exact dollar figures.
Traditional consultants charge $15,000β$30,000 and take 6+ weeks. We do it in 7 days for $1,000 β guaranteed. After the first 2 founding clients, the rate goes to $3,000.
π₯ 2 Founding Spots Remaining at $1,000
Stop Leaking Profit. Lock In Your 7-Day Audit.
1. Send 3 CSVs
Send 3 raw CSV exports β no cleaning or formatting needed. We handle everything from there.
2. Remote 7-Day Analysis
We audit field labor, contract drift, and unbilled work β entirely behind the scenes.
3. Get Your Roadmap
Receive an exact line-item recovery report with a clear implementation plan.